    This standard specifies the main contents of construction planning ofunderground works of hydropower and water conservancy projects aswell as the design guide for construction of different parts.This standard is applicable to the design of construction pl...[继续阅读]

地下工程施工组织设计

11.3 Trackless transportation

    11.3.1 For trackless transportation, loaders or excavators matchingwith dump trucks should be applied.11.3.2 The width of mucking channel shall be determinedaccording to the type of equipment and vehicles adopted. Whenexcavating circular tunnels by full f...[继续阅读]

地下工程施工组织设计

7.1 Drill-blast tunneling method for horizontal slope tunnels

    7.1.1 Cyclic footage shall be determined based on tunnelsurrounding rock classification, section dimensions and performanceof drilling or mucking equipment.7.1.2 Controlled blasting shall be required for each tunnel orcavern excavation. The number of dril...[继续阅读]

地下工程施工组织设计

4 Design Information and Contents

    4.0.1 Design information(1) Pre-feasibility study report and its review comments.(2) River flow control planning and relevant requirements on floodcontrol.(3) Hydrological and meteorological characteristics and naturalconditions such as topography and geo...[继续阅读]

地下工程施工组织设计

7.6 Underwater rock-plug blasting

    7.6.1 The rock-plug blasting method may be applied forconstruction of deep water inlet.7.6.2 The selected location of rock plug shall comply with thelayout of hydraulic structures, and have good blasting conditions. It isrequired that the surrounding rock...[继续阅读]

地下工程施工组织设计

13 Concrete Lining Construction.

    13.0.1 For concrete lining of underground tunnels, full face placingor partial placing shall be adopted for long tunnels with circularsections; for tunnels with square or circular sections, the crown andsidewall concrete should be placed at the same time;...[继续阅读]

地下工程施工组织设计

7.2 Inclined shaft excavation

    7.2.1 When excavating from the top down, full face tunnelingmethod shall be preferred, rail-mounted drilling, loading and muckingequipment shall be used.7.2.2 When the slope is not steeper than 30°, tramcar should beused for mucking in the top down excava...[继续阅读]

地下工程施工组织设计

12 Installation of Underground Penstocks

    12.0.1 Penstocks installation may be conducted after thecompletion of tunnel (shaft) excavation and support works.12.0.2 The transportation channels for penstocks should beselected as the followings.(1) The penstocks shall be transported to the lower hori...[继续阅读]

地下工程施工组织设计

11.1 General principles

    11.1.1 The mucking machineries for loading, traction andtransporting shall be matched. When condition permits, equipmentwith higher loading and carrying capacity shall be adopted.11.1.2 The speed and spacing of vehicles shall meet safetyrequirements.11.1....[继续阅读]

地下工程施工组织设计

9 Supporting

    9.0.1 The support of underground works during construction shallinclude the portions outside the tunnel portal affecting safeconstruction.9.0.2 Before the commencement of excavation of tunnel, theexcavated slope at the tunnel portal and the hillside above...[继续阅读]

地下工程施工组织设计
科普知识
心理健康 优生优育 休闲旅游 健身美容 饮食健康 人与自然 地球家园 海洋技术 科海拾贝 科学之迷 科技前沿 科技史话 科幻未来 神话传说 童话故事 致富指南 农用物资 生物技术 畜牧兽医 园林花卉 特产养殖 营养早餐 减肥晚餐 晚餐食谱 营养晚餐 减肥中餐 中餐文化 中餐菜谱 中餐营养 健康早餐 减肥早餐 早餐食谱 晚餐禁忌 宝石鉴定 安全生产 安装钳工 钣金技术 宝石观察 焙烤工业 变性淀粉 插花技能 车工技术 道路工程 低压电器 电气工程 电气设备 电网工程 电源技术 电站工程 淀粉科学 调味配方 发电节能 防水材料 飞机飞行 服装生产 钢铁材料 工程建设 工业工程 公路工程 管道工程 罐头工业 国际组织 国家电网 华北电网 火电工程 货运物流 机床设计 机电工程 机修钳工 基本资料 家用电器 建设工程 节约用电 金银技术 金属材料 连续铸钢 轮机工程 奶牛养殖 农村电工 配电技术 皮革工业 啤酒工业 苹果产业 钳工简明 青工车工 青年审美 肉类工业 入侵检测 食品科学 世界修船 兽医兽药 水下工程 税收制度 通信设备 统计公文 土木工程 维修电工 味精工业 文物鉴赏 物业电工 铣工计算 线损管理 鞋楦设计 烟草工业 盐业产品 冶金产品 液压技术 印刷科技 用电管理 油墨技术 轧钢技术 粘接技术 照明设计 制浆造纸 土元养殖 兔场疾病 外国美术