7.2.1 When excavating from the top down, full face tunnelingmethod shall be preferred, rail-mounted drilling, loading and muckingequipment shall be used.7.2.2 When the slope is not steeper than 30°, tramcar should beused for mucking in the top down excava (共 1185 字) [阅读本文] >>


说明: 本文档由创作者上传发布,版权归属创作者。若内容存在侵权,请点击