3.7.2 Installation of External Locking Device of Switch

    3.7.2.1 After being connected,the locking rod shall be straight and fit well with the insulation plateand splints.3.7.2.2 Adjustment sheets of 3 mm thick shall be preset between the switch rail connection bracketand the switch rail web.It may be used for ...[继续阅读]

高速铁路无砟轨道

模块3 CRTSⅠ型双块式无砟轨道精调技术

    【学习目标】知识目标:1.掌握CRTSⅠ型双块式无砟轨道精调的原理;2.能够认识CRTSⅠ型双块式无砟轨道精调的仪器设备;3.掌握CRTSⅠ型双块式无砟轨道精调的仪器设备的使用方法。4.掌握全站仪的设站及定位方法。能力目标:1.掌握CRTSⅠ...[继续阅读]

高速铁路无砟轨道

3.5 Transposing Laying of Turnouts for Sleeper-embedded Track

    3.5.1 The assembly of the pre-laid turnouts at the laying base shall comply with Section 3.4.Theturnout condition and the limit deviation of all dimensions shall comply with the requirements of item 1to item 53 in Table 1.3.5.2 The switching equipment sho...[继续阅读]

高速铁路无砟轨道

4.1 Inspection Items

    After laying,the turnouts shall be inspected item by item as specified in Table 1....[继续阅读]

高速铁路无砟轨道

3.5.6 Switching Test,Inspection and Acceptance

    3.5.6. 1 After the completion of installation and debugging,the switching resistance test andobstacle test shall be carried out.3.5.6.2 After the completion of installation and debugging,the switching equipment quality shallcomply with Item 47 to Item 53 ...[继续阅读]

高速铁路无砟轨道

3.2.2 Transportation

    3.2.2.1 The half set of switch,movable point frog components,closure rails and track panels shallbe transported in such a way not to cause plastic deformation.3.2.2.2 When turnout sleepers are stacked in multiple layers during transportation by flat truck...[继续阅读]

高速铁路无砟轨道

3.1 Preparation

    3.1.1 Before laying,the type,specification and quantity of turnout components listed in the shipping orderand the packing list shall be checked,and the appearance and quality certificates shall be inspected.3.1.2 The laying of turnouts shall be carried ou...[继续阅读]

高速铁路无砟轨道

3.7.6 Switching Test,Inspection and Acceptance

    3.7.6.1 After the completion of installation and debugging,the switching resistance test and obstacle testshall be carried out.3.7.6.2 After the completion of installation and debugging,the switching equipment quality shallcomply with item 47 to item 53 i...[继续阅读]

高速铁路无砟轨道

2 Normative References

    The following referenced documents are indispensable for the application of this document. Fordated references,only the edition cited applies. For undated references,the latest edition of the referenceddocument (including any amendments) applies.TB/T 1632...[继续阅读]

高速铁路无砟轨道

3.8 Rail Welding and Fastening-down

    3.8.1 Before welding of turnouts with section rails in adjacent track,switching equipment shall beinstalled,commission shall be conducted,and the turnout condition shall comply with Table 1.3.8.2 Welding should be conducted in the sequence of straight sto...[继续阅读]

高速铁路无砟轨道
科普知识
心理健康 优生优育 休闲旅游 健身美容 饮食健康 人与自然 地球家园 海洋技术 科海拾贝 科学之迷 科技前沿 科技史话 科幻未来 神话传说 童话故事 致富指南 农用物资 生物技术 畜牧兽医 园林花卉 特产养殖 营养早餐 减肥晚餐 晚餐食谱 营养晚餐 减肥中餐 中餐文化 中餐菜谱 中餐营养 健康早餐 减肥早餐 早餐食谱 晚餐禁忌 宝石鉴定 安全生产 安装钳工 钣金技术 宝石观察 焙烤工业 变性淀粉 插花技能 车工技术 道路工程 低压电器 电气工程 电气设备 电网工程 电源技术 电站工程 淀粉科学 调味配方 发电节能 防水材料 飞机飞行 服装生产 钢铁材料 工程建设 工业工程 公路工程 管道工程 罐头工业 国际组织 国家电网 华北电网 火电工程 货运物流 机床设计 机电工程 机修钳工 基本资料 家用电器 建设工程 节约用电 金银技术 金属材料 连续铸钢 轮机工程 奶牛养殖 农村电工 配电技术 皮革工业 啤酒工业 苹果产业 钳工简明 青工车工 青年审美 肉类工业 入侵检测 食品科学 世界修船 兽医兽药 水下工程 税收制度 通信设备 统计公文 土木工程 维修电工 味精工业 文物鉴赏 物业电工 铣工计算 线损管理 鞋楦设计 烟草工业 盐业产品 冶金产品 液压技术 印刷科技 用电管理 油墨技术 轧钢技术 粘接技术 照明设计 制浆造纸 土元养殖 兔场疾病 外国美术