20.1 The track circuit power failure supervision shall be set,and the delay time of track circuitpower failure supervision circuit shall be determined according to the maximum time for the recoveryof track circuit equipment from a power failure.20.2 The c (共 698 字) [阅读本文] >>


说明: 本文档由创作者上传发布,版权归属创作者。若内容存在侵权,请点击