7.1 General requirements

所属栏目:水电工程施工地质规程

7.1.1 The geological work for slope works lasts throughout theslope excavation and after formation of final sections.7.1.2 The geological work for slope works shall include thefollowings.(1) Routine geological inspection and observation, and collection of ......(本文共 825 字 )     [阅读本文]>>