6.3 Preparation before test

所属栏目:土石筑坝材料碾压试验

6.3 Preparation before test

6.3.1 Installation of the cylinder: excavate a test pit with a sizematched to the cylinder at the bottom of the test adit, remove looserocks on the bottom of and around the pit, and then pour a levelinglayer of C30 concrete at the pit bottom. Afterwards, ......(本文共 3340 字 , 1 张图)     [阅读本文]>>


推荐内容


科普

更多